Six things worth asking any seller before you buy an expandable home, and how we answer each one. Every answer is something you can check before you pay in full.
Before you buy
Most of an expandable home is built before you see it in person, so it is worth knowing what you can check, what you will pay for on site and who will do the work. These six questions cover what matters once the home arrives. If you are still at the start, read 10 things to know before buying first.
Question 1
It should, and you can check before you have paid in full. The display homes at our Pukekohe showroom are built to the same Deluxe specification as the homes we deliver, so what you walk through is what we build.
Our payment plan is 30% deposit, 40% when your home is built and 30% before delivery. Before the second payment we send photos and video of your own finished unit, so you approve the actual home, not a catalogue image.
Every model we sell is the current-generation design.

Question 2
Every unit ships with the installation manual for that exact model and version, and the factory has an installation video for it as well.
Ask us for the manual before you order. You, or the builder you are thinking of using, can see exactly what the job involves before you commit.
Question 3
Internal walls, the kitchen, bathroom and toilet, internal plumbing, electrical wiring, lighting and power points are all installed in the factory. You will not be putting up walls or running cable on install day.
On site there are three jobs: unfolding and setting up the home, fitting the roof and deck, and interior finishing, which means trims, sealing and adjustment. The final connections to water, power and drainage are made by your local registered plumber and electrician, as New Zealand law requires.

Question 4
Not with us. Installation is priced in three stages, about $3,000 each and about $9,000 for all three, and every stage is optional.
Many customers do part of the work themselves, with family or with a local builder, and ask us for the rest.
| Stage | What it covers | Approx. |
|---|---|---|
| 1 | Unfolding and setting up the home | $3,000 |
| 2 | Roof and deck installation | $3,000 |
| 3 | Interior finishing: trims, sealing, adjustment | $3,000 |
Every stage is optional. Do it yourself, use your own builder, or use us. Final connections to water, power and drainage are made by your local plumber and electrician.
Question 5
You do not have to fly anyone in. A local builder can install the home using the manual for your model and the factory installation video.
If you would rather have our team on site, we quote their travel up front, as its own line, before you order. You can compare it with a local tradesperson and decide.
Question 6
The home unfolds in about an hour. Setting it up, fitting the roof and deck and finishing the interior takes one to three days, and the plumber and electrician typically have the services connected within about a week.
Getting it onto your section depends on the site. Where a crane is needed to set the home in place, it is quoted separately, before delivery.

Walk through the display homes at our Pukekohe showroom, open 7 days, and ask us any of these six questions in person.
Image credits: © Expandable Homes NZ · © Expandable Homes NZ · © Expandable Homes NZ · © Expandable Homes NZ